TenderRYT
Sign in Start free trial

SCALE CHECKS

The title block says 1:50. The door says otherwise.

Measure a door before you take off. If the answer is wrong, type the real scale and watch the length correct itself. Nothing is measured on a sheet whose scale has not been set.

Press M at any time to move round the drawing.

Checking the scale on a 900 mm door
Rev C laid over Rev B: changed areas boxed and numbered

REVISIONS

New revision in. Markups kept. Changes found for you.

Lay Rev C over Rev B and see exactly what moved. Changed areas are boxed and numbered, markups move across, and the add and omit schedule is priced at the rates you used.

YOUR BUILD-UPS

A list from site in Excel. Priced before you finish your tea.

Import a material takeoff and every line is matched to your own build-ups. Sure matches are priced; close ones are shown for you to check. A 15mm bend is never priced as a 22mm one.

A site list from Excel, priced from your build-ups
The Estimate: every takeoff quantity priced from your build-ups

THE ESTIMATE

Your quantities are already there. Just price them.

Everything you measured lands in the estimate on its own, grouped by system, with the drawing it came from. Pick a build-up for each line and the nett cost builds as you go.

  • Quantities stay live: change the takeoff and the estimate follows
  • Price from your build-ups, your rate book or a supplier quote
  • Next line, next unpriced: work down the job without hunting
  • Every line confirmed before it goes to mark-up, so nothing slips through
  • Totals per system and section, and a revision saved at every re-price

MARK-UP AND REPORTS

Nett to tender sum in a few keystrokes.

Set your mark-ups along the top and watch the tender total, the margin and every selling rate update as you type. Then pick a report and send it.

  • Material and labour mark-up for the job, or a different % on any line
  • Prelims and main contractor's discount carried to the tender sum
  • Type a target tender figure and let it work back to the mark-up
  • Selling summary for you, priced BOQ and takeoff quantities for the client
  • Print to PDF or download for Excel, straight from the same figures
Mark-up: job mark-ups, prelims and MCD, then a priced BOQ
EstimateRev C ▾+ New estimate

ORIGINAL

£184,320

Tender issue

REV B

£191,045

Copy of Original

REV C

£196,880

Working on

Figures are illustrative.

SEVERAL ESTIMATES PER JOB

Re-tendered? Copy the last one and carry on.

Start a new estimate empty, or as a copy of any earlier one with its drawings, markups, rates and letter. Each stands on its own, so the original stays exactly as you sent it.

TENDER LETTER

The letter writes itself. Your notes stay private.

Every drawing and revision is listed for you. Tick a note as a clarification and it goes on the letter. Internal notes never reach the client, by design.

Tender submission: Leisure centre refurb

Thank you for the opportunity to tender. Our offer is based on the drawings and documents listed below and the clarifications that follow.

Drawings

M-100 Ground floor heating · Rev C
M-101 First floor heating · Rev B
V-200 Ground floor ventilation · Rev A

Clarifications

1. Builder's work in connection is excluded.
2. Controls wiring by others.

Tender sum, excluding VAT[TENDER TOTAL]

ALSO BUILT IN

The small things that save the hours.

Find symbols

Click one symbol on the drawing and the software finds the rest that match. You check them, keep the right ones and the count is done.

Mark-up reports

A bill of quantities, a selling report and a takeoff-only report, straight from your marked-up drawings. Ready to send or to check against.

Tender letter templates

Save your own letters as named templates and pick the right one for each job: one for main contractors, one for direct clients, and so on.

Price your next tender on TenderRYT.

7 days free, every feature, no project limits. Your training guide and videos arrive by email straight away.

WHAT HAPPENS WHEN YOU SIGN UP

1 · STRAIGHT AWAY

Your training pack by email

The moment you start your trial we email you a step-by-step training guide and short how-to videos, so you can price a real job from day one.

2 · DURING YOUR 7 DAYS

Try it on a live tender

Load your own drawings, take them off and price them. Every feature is open and there are no project limits. During the trial, all exports and print-outs carry a watermark.

3 · WHEN YOU SUBSCRIBE

Book your own training session

Upgrade at any time and everything you did in the trial is kept: nothing is lost, and the watermark comes off. Then book a dedicated training session for you and your team.

✓ Upgrade at any time✓ All your work saved, nothing lost✓ Watermarked exports during the trial only

Coming soon: TenderRYT Academy · estimating training, and TenderRYT Cost Plan · early Mechanical and Electrical budgets.